GALLERY

Some examples of our latest achievements.

1. For residential installations : Non-collective sanitation

Pre-filter installation

Pre-filter installation

Connecting the new installation

Connecting the new installation

Installation of a non-collective sanitation

Installation of a non-collective sanitation

Finishing of the manhole

The finished manhole (with hydraulic joint)

Removal of previous installations

Removal of previous installations

Digging and searching for defective pipe

Digging and searching for defective pipe

Restoring the site to its prior state


2. For local communities

2.1. Wastewater treatment plant

Only access to the site...

Only access to the site...

Preparation of the worksite

Preparation of the worksite

Lifting measurement container

Lifting measurement container

Installation of a measurement container

Installation of a measurement container

Positioning of a measurement container

Positioning of a measurement container

Finishing installation measurement container

Finishing installation measurement container

Tank cleaning

Tank cleaning

Tank in working condition

Tank in working condition


2.2. Finishing after de-gassing and neutralizing concrete

Adding topsoil after neutralizing the concrete tank

Adding topsoil after neutralizing the concrete tank

The completed worksite

The completed worksite